Tidal energy
Type of resources
Available actions
Topics
Keywords
Contact for the resource
Provided by
Formats
status
-
-- Warning, deliverable only available in French -- Delivrable D02.05 of the FEM PHYSIC 2015 project WP 2: Definition of the data acquisition strategy Task 2: Choice of measuring instruments
-
-- Warning, deliverable only available in French -- Delivrable D02.05 of the FEM PHYSIC 2015 project WP 2: Definition of the data acquisition strategy Task 2: Choice of measuring instruments
-
-- Warning, deliverable only available in French -- Deliverable D02.03 of the FEM PHYSIC 2015 project Lot 2: Definition of the data acquisition strategy Task 1: Synthesis of knowledge
-
-- Warning, deliverable only available in French -- Delivrable D02.05 of the FEM PHYSIC 2015 project WP 2: Definition of the data acquisition strategy Task 2: Choice of measuring instruments
-
-- Warning, deliverable only available in French -- Delivrable D02.05 of the FEM PHYSIC 2015 project WP 2: Definition of the data acquisition strategy Task 2: Choice of measuring instruments
-
This document includes the main requirements, use cases, as well as implementation details and is completed with some examples; it can serve as a technical manual of the catalogues module. This document describes the functionalities and the technical aspects of the code implemented to meet them. The catalogues module will provide users with a single source of reference data that can be managed and used in other modules or tools of the DTOcean+ suite to ease inputs during different phase of a project.
-
The objective of Task 4.3 was to carry out the testing of the Stage Gate design tool in order to verify that it meets all the previously defined requirements (in WP2 and T4.1). This report documents the outcome of T4.3 “Verification of the Stage Gate design tool.”
-
Measurement of the diameter of biocolonised moorings and biofouling composition at T+6 months of immersion.
-
To reduce the number of interventions and maintenance operations, it is necessary to monitor the proliferation of marine fouling in real time and over a long period. This is why it is necessary to have an in situ optical video system that is protected for as long as possible against biocolonisation.
-
This report outlines the proposed architecture and main functions of the DTOcean mooring and foundation design module and its interaction with other elements and modules of the tool